31st December 2007
Being the last day of the year, I wanted it to go out with a bang...
A rainy day with showers and mist all day, however something big had to happen.
I managed to drag this side piece along the side of the boat and positioned the stands.
Lined up fine and sitting on the spray rail
Ready for welding in place
This next piece for the other side had to be dragged out with a truck
Then dragged forward using a pulley systen and a van!
Up it went easier with out the mud bath.
Span sets are to secure it in place till I weld it
Both sides are positioned and secured,
I will power wash them before welding as they are covered in mud.
Not bad for 1 person in the rain..
A good year end, considering it was only started November 9th.
Happy New Year!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment