5/14/08

14th May 2008

One of the keel sides fitted, some adjusting was needed but it fitted fine in the end.


Welded most of the way


starting to prepare for the back of the keel


Pulling in the two sheets to form the back of the keel.



5/12/08

12th May 2008

Yet another delay in the build due to work.
Back at it again and the aft cabin is nearly fully welded,
The Keel was next to go in with the stern tube measured uo to line the keep frames to

Other news:

The engine and hydraulics are all sorted and I hope to have them here in June.
All supplied by VETUS.





Side plates next and then its done.
this will be fully welded rather than tacked.