Friday 9th November
Progress has been held up for 3 days as we couldn't get a frontloader to hire.
with only 3 people around it was impossible to lift the sheets.
We used the Truck as a flat surface to Tack the sheets of the floor together.
With no sides, we loaded from one side and unloaded from the other.
Assembling the sheets on the only flat surface I have.
The sheets were then lifted through the truck onto the hull jig.
The 2 Aft sheets layed onto the jig.
3 of 4 sections layed in.
Last piece being added.
Under the cover of darkness and lack of camera on the same day we lined up the sheets and tackwelded the aft ones together.
As you can imagine, it looked like it would never line up and form a good shape as a boat rather than apile of scrap metal. !
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment