Saturday 3rd November 2007
I have 2 days off in a mad time at work. 8 am sees me outside trying to sift trough the piles to sort it out,
The first thing I did was to get the fuel tanks inside and coated with WD40 as I won't need them till March-08. I got as much done but having nobody else or the Frontloader I needed but couldn't get, I have to get more help next week.
I started on the Jigs for the boat. These will be welded to the RSJ frame to shape and support the boat.
David helps with the assembly
6PM and 2 frames done and an hour later sees the 3rd one done.
PS. Anybody got a small crane for a week or 2.!