1/3/10

Clonmel Covers made this new roof for the boat.

Its reinforced, takes 2" steel pipes each side to tension it and is secured with webbing every 8 feet.

We hauled it up and over with 3 800 kg winches.



It was supposed to be an 8 man job but I managed this on my own with the boys doing the winch control.












Soon I will have the gables on and get new side plascic and attach it in a better way.
Anybody going the the Excel Boat show London??
I'll be there 11th and 12th.

3 comments:

Unknown said...

Jaysus man,
That's some hardship to have to put up with because of the weather.
Hope that things are back on track (if not schedule) for you now.

John.

455 stainless bars said...

wow, that looks kinda heavy. How much does it weigh? I wonder if it can still float.. hmm

Unknown said...

The blog idea is too value able.The blog idea very help full me.I can follow the blog post.
boat building gold coast