22nd June 2008
Bright and really windy day today, No point in trying to finish weld as the wind is too high.
I decided the aft steps were going in today,
the small welds needed would be fine if they were wind blown.
As it was , It was access to the inside for months now.
Inner curved plate and capping strip hammered into shape as it was welded up to the top.
3 of the 5 steps fitted.
The finished steps, I did move the curved bit on the side to fit to the steps correctly,
Product testing, Dara was the first to climb them.
He spent the day helping me.
1 comment:
Good to see you back! keep it up, thanks for the blog on boat building... Ken over at SF Bay USA
Post a Comment