27th June 2008
No pictures to show, but work well under way.
The Aft Cabin roof has been fully welded and is now totally waterproof.
The Flybridge floor has also been welded down and tidied up where I cut out for the new door.
The Aft steps are 50% fully welded in and should be done over the weekend.
All thats left will be the upper spray rail and the fore deck roof. then alot of tidying up.
some time next week I should be doing the out side welding..
I've been messing with the grawings to produce a line drawing that can be used for some of the panels,
This is the boat as will be built on its waterline, I like it!
No comments:
Post a Comment