3rd January 2008
The frontloader wasn't collected so we made use of it while we had it.
Milo & I worked hard to complete the cabin bulkhead and line it up. Usual tensioning and lifting to get it right. Next went in the upper transom wall. I specified 2 port hole windows, you have to have one for escape but as its at eye level, I thought 2 would be nicer. The view while under way will be fab. It also gives more light into the cabin.
Stood up and tacked to the swim platform.
We raced to get the roof sections into place with a few welds to hold it together. the roof of this can only go in with the loader. It's 13 feet off the ground.
Aft roof goes up
All tacked into place. As such the only way forward on the boat is to climb under the front bulkhead. Soon I will cut the doorway to the main saloon and make some temporary steps.
The frontloader wasn't collected so we made use of it while we had it.
Milo & I worked hard to complete the cabin bulkhead and line it up. Usual tensioning and lifting to get it right. Next went in the upper transom wall. I specified 2 port hole windows, you have to have one for escape but as its at eye level, I thought 2 would be nicer. The view while under way will be fab. It also gives more light into the cabin.
Stood up and tacked to the swim platform.
We raced to get the roof sections into place with a few welds to hold it together. the roof of this can only go in with the loader. It's 13 feet off the ground.
Aft roof goes up
All tacked into place. As such the only way forward on the boat is to climb under the front bulkhead. Soon I will cut the doorway to the main saloon and make some temporary steps.
View of roof
Outside view. Better pic in daylight.
No comments:
Post a Comment