2nd January 2008 Part 2:
Madness continues... having the front loader till the morning, I figured it was best to stay working with it. Time = money and all that.
One slight problem was the gale force wind blowing from bow to stern.
It meant that the piece blew around like a piece of paper, It took time to line up but I managed to get it in right, as did the other side.
Clamps at work, I think I have 28 of them in various shapes.
2nd side going in.
Fitted left hand side.
Better picture of the inside curve.
No comments:
Post a Comment