Clonmel Covers made this new roof for the boat.
Its reinforced, takes 2" steel pipes each side to tension it and is secured with webbing every 8 feet.
We hauled it up and over with 3 800 kg winches.
It was supposed to be an 8 man job but I managed this on my own with the boys doing the winch control.
3 comments:
Jaysus man,
That's some hardship to have to put up with because of the weather.
Hope that things are back on track (if not schedule) for you now.
John.
wow, that looks kinda heavy. How much does it weigh? I wonder if it can still float.. hmm
The blog idea is too value able.The blog idea very help full me.I can follow the blog post.
boat building gold coast
Post a Comment