12th October 2008
Am... hello ... rem me..
To the many who have been checking in all the time thanks for staying with this.
Cam working again, need to get the spider web off the lense.
Now story time.....
I hope you all enjoyed the lovely wet summer we have had here, between the weather and work I am now some months behind where I wanted to be.
The pictures below are really from the last post until the other day so they are not really recent.
Some things that are now done:
All the internal welding is now complete
All the outside main sheets running on the spray rails are complete, as are all the top bulwark edges and all of the flybridge.
The Internal entrance steps are 50% DONE just to wait till the engine lands in and I can finish them to the floor.
The radar arch is up and fully welded except for internal fittings to close the inside bits with white plastic.
Radar arch before fitting
New Re-designed entrance and seat, its way smaller than was as I realised I hadn't any 7 Foot friends. The entrance first step being sofar back meant I could take 4" off the top and rake the front way back to mimic the radar arch angle. (thanks to Edgar for showing me the error of my ways) I had really made a big square box on top of the lovely sweeping lines of the radar arch.....
Here she is in all her glory.
If you plugged the stern tube it would float .!!!!!!
I closed off the end of the flybridge wall and merged the radar arch. its totally smooth once sanded and will look great, I also added a dummy piece to thicken the side sheet. bent a bit of 50mm bar onto it.
About 3 weeks ago I finally ordered all the Vetus kit.
Soon the engine, hydraulic tank, pump and thrusters will be here along with steering and controls.
I have also designed a 1200 litre fresh watertank for up under the fwd floor.
This is a 2 part post..
No comments: