29th Feb 2008
Today we built the 2 x 1000 litre fuel tanks.
They were tacked and lined up fine.
Once finished and painted, they will stay above the floor until the full welding is complete in the engine room, then insulation and finally the tanks will be sited under the floor.
Partly welded to stop it from warping.
End section, welded inside and outside.
The flux cored wire is magic.
No comments:
Post a Comment