22 + 25th Nov 2007
Progress under way again, 6 hours on Thursday to finish the Aft cabin floor and get the frames 9 +10 in (5 more to go)
2 hours on Saturday fitting the frame tops 5-8
Forward of the engine bay stringers
Its size is really starting to show.
Today
added the aft frames 1-4 tops.
The side stringers and the frame stiffeners to be fitted next.
I also need to sort out acess to the hull from the rear as the sides will be impossible very soon.
Weather permitting , next work on tuesday, weds this week.