Pictures taken 10-march 2009,
1200Litre Fresh water tank assembly in Eurofab
Under sides all tacked and lined up ok.
I did have a slight error on my drawing and had to fit it somewhat.
Inside ring for access hole (4 in total) with the bolts welded.
All stainless
Strip welding the baffles in place.
As of 10th April the tank is only waiting for the lid to be fitted and some pipework.
All outside welding done.
4/14/09
Finished raised floor
Part of an update,
Pics taken 11th March 09.
Finished new floor height
Centre Girders back in place
New Cut in 1st step to aft cabin, now there will be 4 steps instead of 3 and will be better
Aft Bulkhead getting reinforcing box to carry aft wall
Pics taken 11th March 09.
Finished new floor height
Centre Girders back in place
New Cut in 1st step to aft cabin, now there will be 4 steps instead of 3 and will be better
Aft Bulkhead getting reinforcing box to carry aft wall
Once this was in I re -attached new 50mm angles to the aft wall and cut out the lower origional ones